Share
Online message

Cleaning and replacement of check valve in pump

2019-02-27 08:001114
Return

(1) Turn off the power supply of the instrument;

(2) Remove the inlet and outlet pipeline of the pump;

(3) Unscrew the upper and lower check valves;

(4) Put the check valve body into the cleaning solvent (such as acetone or ethanol) and place it in the ultrasonic cleaner for 20-30 minutes;

(5) After cleaning, install one-way valve;

(6) Restore the pipeline, connect the power supply and exhaust bubbles.

D100型离子色谱仪-4.jpg

Copyright 2021 Sheng-Hanp. All rights reserved. I Site Map. I Technical support: NewView